Description
this barrel has been sitting on the sidewalk since November 2016 when it was placed over a small sinkhole in the street. When the street was repaired in December, it was moved on to the sidewalk where it has been now for more than 7 months.
also asked...
Q. Please describe the sidewalk issue using the box below.
A. Orange construction barrel
A. Orange construction barrel
7 Comments
RRC Director - Judi (Verified Official)
Code Compliance - Valerie (Verified Official)
Code Compliance - Valerie (Verified Official)
Acknowledged Code Compliance - Valerie (Verified Official)
Code Compliance - Valerie (Verified Official)
Traffic - Patricia L (Verified Official)
Closed Traffic – Jennifer C (Verified Official)