Description
On Friday 6/23/17 a "Tilz" gravel truck destroyed the drainage in bucsit Lane while attempting to turn around. The ditch is now a 50 ft jumble of mud piles and the culvert isnot flowing well. Please address this issue. Thank you.
On Friday 6/23/17 a "Tilz" gravel truck destroyed the drainage in bucsit Lane while attempting to turn around. The ditch is now a 50 ft jumble of mud piles and the culvert isnot flowing well. Please address this issue. Thank you.
3 Comments
Admin (Verified Official)
Acknowledged PW-Engineering-PCienega (Registered User)
Closed Public Works O & M (Registered User)