Description
PGE subcontractor Veteran Power ripped up sidewalk in April and filled with bumpy temporary patch material. They still have not been back to repair concrete sidewalk.
PGE subcontractor Veteran Power ripped up sidewalk in April and filled with bumpy temporary patch material. They still have not been back to repair concrete sidewalk.
3 Comments
Coco (Registered User)
Closed Brian M., Street Section (Registered User)
skot9000 (Registered User)