I am asking the town to finish the road surface without chip/seal or pea pebbles as this will ruin the current road finish. Our neighborhood is residential and has no commercial traffic and our children are overjoyed with being able to rollerblade, scooter, and all the varied activities this smooth surface affords us. This is a rare opportunity to step up and make this neighborhood a truly user friendly home for all of us. Our gravel pit on Oak St would be an ideal location for all that extra road material. That you very much for the beautiful new roads and sidewalks here in the Sherwood area. Jim Heithmar
a aussi demandé...
A. roadway improvement/sidewalk project
A. 2 surrey lane
6 Commentaires
DPW (Membre officiel vérifié)
Assistant Town Engineer (Membre officiel vérifié)
sherwood road/sidewalk project (Utilisateur inscrit)
Jake (Utilisateur inscrit)
Assistant Town Engineer (Membre officiel vérifié)
Jake:
Due to the the cold weather starting to be upon us, the chip seal of the roads will not take place until next year (most likely late spring) which is consistent with how we have done the chip seal in the past. Chip seal gets installed on more neighborhood type roads and not on the larger roads that get more traffic. The reason why the Chip Seal was not done on Burning Tree is because the road had to be dug down to the sub base due to geotechnical issues with the materials underneath which needed a more extensive rehabilitation process than the normal level, overlay and chip seal that the neighborhood roads received. In the future when Burning Tree gets to a point where additional rehabilitation is needed, it is very likely that it will be chip sealed like most of the other neighborhood roadways.
Clos Public Works Director (Membre officiel vérifié)