说明
The bike/pedestrian all-purpose path that runs behind Stelyard Commons to Jennings, at the end of it where it transitions to the Jennings Rd. bike lane has a curb about 10 inches high. Riders from the Jennings bike lane to the all-purpose path and visa versa have to dismount lift and carry their bikes over this curb. The curb needs to be knocked down and tapered from path level to street level to allow a smooth transition from one to another.
2 评论s
Vickie C (客人)
关闭 VC (客人)