Description
A couple of weeks back they replaced water pipes on the street to sidewalk. When laying the cement they left a huge gap between the driveway and the sidewalk and the front of the flower bed. It’s a hazard. When winter comes it’s going to be a issue for myself getting in my drive way. This is the second complaint I’ve made about this issue and nothing has been done.
5 Comments
City of Malden (Verified Official)
Robert P. Knox Jr. (Director of Public Works) (Verified Official)
Hi we received your request and I have forward this concern to Glenn Calla from engineering which is in charge of the lead line replacement program with the contractors. He will be in touch with you and also the vendor to make any repairs. You can reach Glenn directly at gcalla@cityofmalden.org
Thanks
Bob Knox Jr.
Director
Department of Public Works (Verified Official)
Department of Public Works (Verified Official)
Godkänd Alex Almasi (Engineering Department) (Registered User)
Hi,
We have reported the issue to the contractor. It will get repaired soon. Thanks