الوصف
150+ new units built across the street from a north ave bus stop. Kids, elderly, lots of folks playing frogger everyday crossing here. I've seen many close calls.
150+ new units built across the street from a north ave bus stop. Kids, elderly, lots of folks playing frogger everyday crossing here. I've seen many close calls.
7 تعليقs
Permitting and Inspections (تم التحقق رسميا)
IT Department (تم التحقق رسميا)
SCormier (تم التحقق رسميا)
SCormier (تم التحقق رسميا)
تم إقراره Bill Ward Director of Permitting and Inspections (تم التحقق رسميا)
SCormier (تم التحقق رسميا)
Requested contact information received.
Issue acknowledged - assigning to DPW's Technical Services Division Engineer Technician.
مغلق SCormier (تم التحقق رسميا)
https://www.burlingtonvt.gov/DPW/North-Avenue-Unsignalized-Crosswalks. The good news is that these new crosswalks are planned to have the rapid flashing beacons (like those on Pine St). Once we’ve got those new crosswalks in, we will be
going back and looking at improving existing crosswalks - issue closed.