Road Sign Maintenance Archived

84 Avenue Grande Prairie, Alberta Show on Map Hide Map
Move the marker to represent your issue's location. The address will not change.

Issue ID:

4057469

Submitted To:

City of Grande Prairie

Category:

Road Sign Maintenance

Viewed:

80 times

Neighborhood:

Grande Prairie

Reported:

on

Description

When construction is active in this area the east lane northbound was partial closed. no signage for Traffic/Drivers on 84 ave heading east to Resources Road. Who is responsible for the correct signage? The last posted speed limit on 84 ave is 60 km/hr Resources Road in and around this area is 70 km/hr. If no signage is displayed who is at fault when a violation occurs to a driver ? Do the local RCMP or Peace Officer not have to follow the same rules as the traffic safety standards and ensure the correct signage is in place and visible before assigning a traffic violation? When construction occurred at the intersection of 100 street and 84 ave signage was visible and the speed limit was 50 km/hr as opposed to the regular speed limit 60 km/hr while construction workers were working in that area. It is confusing for drivers when there is no signage and no one seems to take responsibility for the matter


4 Comments

Comments are closed for archived issues.