说明
When weather permits, please sweep the uphill side of Colchester Ave (top to bottom). There is currently 4 feet of soil, gravel, and trash from the curb into the road. Additionally, there are blocked drains.
还问了...
问 Is the sweeping needed on the street or sidewalk?
答 street
答 street
14 评论s
DPW Pine Customer Service (官方验证)
已确认 DPW Pine Customer Service (官方验证)
Lee Perry, Assistant Director, Maintenance Division (官方验证)
theandreatodd (注册用户)
DPW Public Information Manager (官方验证)
OldVtr (注册用户)
theandreatodd (注册用户)
Fred (注册用户)
theandreatodd (注册用户)
Fred (注册用户)
Toiletmanners (注册用户)
Display Name Blocked (409268) (注册用户)
Wow Fred, are you intentionally being ignorant?
It shows that 1 year ago (12 months ago) DPW has a street sweeper out. Therefore one can deduce that DPW can begin sweeping the same time this year. It has nothing to do with the temperature of the road. Line stripping was dependent on the road temp. Hope this helps.
Display Name Blocked (409268) (注册用户)
Also like to reiterate OldVtr's comment, "An extensive Operation Cleaner Sweep is needed in the late fall for just these reasons"
I've been asking DPW for Fall sweeping for years. Their answer, "WE DONT!"
关闭 Lee Perry, Assistant Director, Maintenance Division (官方验证)
Swept during clean sweep.