Sharraxaadda
Wax sharraxaad ah aan bixin.
sidoo kale waydiiyey...
S. Street Name
J. Montgomery Street
J. Montgomery Street
S. Describe in detail the full request such as starting and ending point for resurfacing:
J. Huge pot hole in front of 372 Montgomery Street. Please repair. Street cleaning days are Tuesday and Friday 8-10
J. Huge pot hole in front of 372 Montgomery Street. Please repair. Street cleaning days are Tuesday and Friday 8-10
8 Faalladas
RRC <small class="fwn">(La Caddeeyey Rasmi ah)</small>
Engineering - Paul R (La Caddeeyey Rasmi ah)
Engineering - Paul R (La Caddeeyey Rasmi ah)
La qiray Buildings and Streets-Cynthia (Isticmaale Diiwaangashan)
Thank you for your request. Potholes referred to the Division are normally processed within 48 hours.
Sinkholes will be referred to the appropriate utility agency for inspection and repair.
Please note that potholes cannot be repaired on days with heavy rain because the moisture will prevent asphalt from bonding with the existing pavement.
La xidhay Buildings and Streets-Cynthia (Isticmaale Diiwaangashan)
Reopened Betty (Isticmaale Diiwaangashan)
La qiray Buildings and Streets-Cynthia (Isticmaale Diiwaangashan)
Thank you for your request. Potholes referred to the Division are normally processed within 48 hours.
Sinkholes will be referred to the appropriate utility agency for inspection and repair.
Please note that potholes cannot be repaired on days with heavy rain because the moisture will prevent asphalt from bonding with the existing pavement.
La xidhay Buildings and Streets-Cynthia (Isticmaale Diiwaangashan)