Deskripsyon
Walang deskripsiyon na ibinigay .
ay nagtanong din...
T. Street Name
S. Montgomery Street
S. Montgomery Street
T. Describe in detail the full request such as starting and ending point for resurfacing:
S. Huge pot hole in front of 372 Montgomery Street. Please repair. Street cleaning days are Tuesday and Friday 8-10
S. Huge pot hole in front of 372 Montgomery Street. Please repair. Street cleaning days are Tuesday and Friday 8-10
8 Komentos
RRC <small class="fwn">(Beripikadong Opisiyal)</small>
Engineering - Paul R (Beripikadong Opisiyal)
Engineering - Paul R (Beripikadong Opisiyal)
Kinilala Buildings and Streets-Cynthia (Rehistradong User)
Thank you for your request. Potholes referred to the Division are normally processed within 48 hours.
Sinkholes will be referred to the appropriate utility agency for inspection and repair.
Please note that potholes cannot be repaired on days with heavy rain because the moisture will prevent asphalt from bonding with the existing pavement.
Isinara Buildings and Streets-Cynthia (Rehistradong User)
Reopened Betty (Rehistradong User)
Kinilala Buildings and Streets-Cynthia (Rehistradong User)
Thank you for your request. Potholes referred to the Division are normally processed within 48 hours.
Sinkholes will be referred to the appropriate utility agency for inspection and repair.
Please note that potholes cannot be repaired on days with heavy rain because the moisture will prevent asphalt from bonding with the existing pavement.
Isinara Buildings and Streets-Cynthia (Rehistradong User)