الوصف
I ride across this junction safely, yet I am still concerned my wheel will catch between the track and asphalt and throw me from my bike.
The main issues are:
1) The asphalt between the tracks is in some places several inches higher than the tracks themselves.
2) The crack between the track and asphalt is fairly wide.
3) The asphalt is dangerously uneven.
12 تعليقs
James Calnan (ضيف)
Thanks Ron - I'll find out when this is scheduled for improvement / repair and post that here
~ James Calnan
Angela Palaisy (مستخدم مسجل)
James Calnan (مستخدم مسجل)
I spoke to the folks at Parks and Rec and the intention is to make repairs as soon as possible, and in the meantime to make notice of the reported condition.
A big issue at this crossing point is the need to have work permitted by the railroad, and apparently that's not as easy as it should be....
Ron Wolosyn (مستخدم مسجل)
James Calnan (ضيف)
James Calnan (مستخدم مسجل)
Ron Wolosyn (مستخدم مسجل)
Ron Wolosyn (مستخدم مسجل)
James Calnan (مستخدم مسجل)
not sure, I haven't been out there for a while, but I sent it again today as a reminder to the Manager of Parks Operations (who was originally notified) to see if its been dealt with
I get timely reminders of items that haven't been closed, this was one of them
James Calnan (مستخدم مسجل)
Ron Wolosyn (مستخدم مسجل)
مغلق Ron Wolosyn (مستخدم مسجل)