Description
When will Lincoln Street be repaved? The entire stretch of Lincoln Street is in great need of repairs. Please address this issue instead of filing it closed.
also asked...
Q. Location of the problem
A. Lincoln Street
A. Lincoln Street
10 Comments
Program Administrator (Verified Official)
Acknowledged Public Works Dispatch (Verified Official)
Public Works Dispatch (Verified Official)
Closed Engineering Division (Registered User)
Thank you for your inquiry on this project. Lincoln Street between Broad Street and Lakeside Ave. will be reconstructed and paved this spring/summer 2018 as part of an active capital improvement project.
The project consists of constructing new masonry walls or the rebuilding of existing field stone masonry walls; the installation of new sidewalk/curbing or the replacement of sidewalk/curbing; roadway reclamation and roadway paving. Estimated project duration is +-90 Days.
Reopened An anonymous SeeClickFix user (Registered User)
Engineering Division (Registered User)
We have shared your report with the Streets Division. They will address necessary repairs as soon as possible.
Thank you for your message. If you have further concerns please contact Public Works Dispatch at (508) 624-6910.
Street Division (Verified Official)
Street Division (Verified Official)
An anonymous SeeClickFix user (Registered User)
Closed Street Division (Verified Official)