Description
The bridge over 400 on Haynes bridge needs some concrete filled back in because there is a gap that is big enough to feel in a vehicle. It is in the west bound lanes on the bridge. Also, might want to do a detailed inspection of the bridge for overall strength and stability.
3 Comments
Acknowledged City of Alpharetta (Verified Official)
City of Alpharetta (Verified Official)
http://www.dot.ga.gov/BuildSmart/Pages/ContactUs.aspx. In addition, here is a link to GDOT’s webpage for the bridge: http://www.dot.ga.gov/applications/geopi/Pages/BridgeDocument.aspx?StructureID=121-0303-0.
Closed City of Alpharetta (Verified Official)