This is new construction and the street lights need to be installed by the Developer/PSE&G. A request was sent to bolt cones to the foundations until the lights are installed.
The developer is currently working on the final roadway construction and new lighting will be installed as part of the work. It will be completed later this year. Thank you.
12 评论s
erik (注册用户)
RRC <small class="fwn">(官方验证)</small>
Commerce - Vishaul (注册用户)
Commerce - Vishaul (注册用户)
已确认 Engineering - Drew B (官方验证)
erik (注册用户)
Engineering - Drew B (官方验证)
erik (注册用户)
关闭 RRC - Kirkland (官方验证)
Reopened RRC - Kirkland (官方验证)
RRC Assistant Director - Waseem (官方验证)
关闭 Engineering - Drew B (官方验证)