Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
The Town currently repairs sidewalks based on the roads with the oldest complaints. Once we get to a street, we attempt to repair all sidewalk problems on the street. We are currently working on streets with complaints from 2007 and are about to begin 2008 streets. Based on current funding and given your street is a 2018 street, we do not have a good estimate on when the repair will be conducted.
You just repaired some right on this street, few houses down from the complainant. Why not just take care of the whole street at once? Stop trying to save a buck and get the job done!
5 Comments
Staff Engineer (Verified Official)
Acknowledged Staff Engineer (Verified Official)
Closed Engineering Inspector (Registered User)
Catch (Registered User)
Staff Engineer (Verified Official)