Description
I believe it was capital paving that replaced sidewalks on 53rd Pl SE and never finished the work! I've called them and left SEVERAL messages but they never return my call. Both sides of the alley entrance sidewalk are not completed and are gravel. This is not only a safety hazard but causes gravel and mud to run in the streets after heavy rain fall. Please fix this ASAP!
2 Commentaires
Reconnu DC 311 (Utilisateur inscrit)
An anonymous SeeClickFix user (Utilisateur inscrit)