الوصف
Chabot Road is used as a thoroughfare and there are many potholes along it between College Ave and the Chabot Rec Center. It is in severe need of repair and/or complete repaving.
مراسل صحفي
Chabot Road is used as a thoroughfare and there are many potholes along it between College Ave and the Chabot Rec Center. It is in severe need of repair and/or complete repaving.
28 تعليقs
تم إقراره City of Oakland (تم التحقق رسميا)
At your convenience, please review the following information regarding the City of Oakland Street/Sidewalk Maintenance Program:
Facts About Oakland's Infrastructure - Streets & Sidewalks http://www2.oaklandnet.com/Government/o/PWA/s/SST/index.htm
5-Year Paving Plan http://www2.oaklandnet.com/Government/o/PWA/o/EC/s/STS/OAK030328 Please check back for status updates or contact us directly at (510) 615-5566.
Brooke (ضيف)
City of Oakland (تم التحقق رسميا)
This issue can also be followed by watching http://seeclickfix.com/issues/403870
Andrew Stern (ضيف)
Amy (ضيف)
sabra daly (ضيف)
Bumpity, bumpity, bumpity, bumpity, bumpity, bumpity bump.
Could you please fix? Chabot road paving is MIGHTY BUMPY.
Susan Housand (ضيف)
Tamara (ضيف)
Karen Ivy (مستخدم مسجل)
Taft Resident Bill Kaufner (ضيف)
Bruce (ضيف)
Diane (ضيف)
I would be interested in knowing how a small, lightly traveled street in Crocker Highlands (Underhills Road) merited a complete paving two years ago. At the time this street was paved it was not even close to the extreme disrepair in which we find Chabot Road today.
Matt Read (ضيف)
Maxi (ضيف)
40 yr resident of lower Rockridge (ضيف)
LB (مستخدم مسجل)
Rockridge Mom (مستخدم مسجل)
Paul B (مستخدم مسجل)
tkdzin (مستخدم مسجل)
paintrich (ضيف)
Robert Prinz (مستخدم مسجل)
Good news, it looks like the contract that the Chabot Rd street paving is on was approved and is very likely to be completed this year in 2014! This will include the entire stretch of road from College Ave to Golden Gate Ave, and bicycle shared-lane markings will be painted once the paving is complete.
On top of that Oakland has initiated a "pothole blitz" with the intention of filling 2,500 potholes around the city, starting in East Oakland and then moving northwest throughout the next several months. I'm not sure which project will get to Chabot first, but at least there is a lot of movement in a positive direction.
paintrich: Broadway between 38th and Broadway Terrace is also going to be repaved and striped with bike lanes (by this October) and Shafter is getting resurfaced using some discretionary funds from District 1 Councilperson Dan Kalb's office
LB (مستخدم مسجل)
Robert Prinz (مستخدم مسجل)
LB: I know it's hard to wait but the paving work on Chabot Rd is still planned to take place before the end of 2014. Most paving work usually does end up taking place at the very end of the year, as the city works with the contractors to not start their work until all scheduled utility projects have been completed. Otherwise the utility workers end up just cutting into the newly paved street.
The pothole blitz did take place over the summer, by the way, and a majority of the holes that I had reported on other streets were taken care of at that time.
Jeff Baker (ضيف)
Gene - Our Oakland (مستخدم مسجل)
Robert Prinz (مستخدم مسجل)
Bonnie H (ضيف)
مغلق City of Oakland (تم التحقق رسميا)