Description
After paving new road on East Foxboro Street road curbing/edge in front of our driveway is much higher than before leaving large bump to drive over and water runoff from the road is likely to come into driveway rather than continuing to run down road. We would like to request additional asphalt layer at the end of our driveway at same height as new road curbing to prevent water run off into driveway and gradually taper to existing driveway height rather than sharp drop off.
also asked...
Q. Please indicate the type of sidewalk / curb issue being reported.
A. Other
A. Other
3 Comments
Public Works Admin (Verified Official)
Acknowledged Operations Division (Registered User)
Closed Operations Division (Registered User)