说明

The contractor for the responsible for the recent sanitary sewer improvements has severely impacted the drainage along Snover St. between Dickson and Scotland. As part of a separate project, the City had recently improved the ditch along Snover and installed a storm drain with inlets along a portion of the street, attached pictures show its current situation: blocked inlets, standing water everywhere, silt everywhere. All of this a result of the contractor's bad job.
The same contractor was reported previously for leaving a mess in the alley (easement) between Dickson and Oreilly.

还问了...
What is your area of concern?
Damages
Currently under construction?
Yes
Provide the project WBS Number if known.
没有给出答案