The highway division does not have the equipment to seal cracks, and with the condition of the road hiring a contractor to seal cracks would not be feasible.
The Town is aware of the condition of Haynes Street. Public Works has a proposed road referendum under review, which would include full depth reconstruction of Haynes Street.
5 评论s
关闭 Boulette, Ken (官方验证)
Reopened Aymee (注册用户)
Aymee (注册用户)
已确认 Engineering (官方验证)
关闭 Kelly, Paul (官方验证)