Description
Just curious if there is any timeframe in place for replacing the sidewalks on Ridge Road west of St. James/Cartier along with Falcon Crest and Ridgeview Ln? Most of them are in such a state of disrepair that you can't push a stroller on them or have kids ride their bikes, forcing them into the road (which is also in rough shape).
3 Comments
Mike L (Registered User)
Acknowledged Engineering (Verified Official)
Closed Kelly, Paul (Verified Official)