Mô tả
The new pavement on northbound MLK Jr Way just south of 31st St was cut into by EBMUD for utility work in the bike lane, and the temporary patch is inadequate with a significant bump for anyone who rides over it. EBMUD needs to return soon to resurface this patch and bring it back to new condition, but in the meantime the existing temporary patch needs to be addressed.
cũng đã hỏi...
Hỏi. Is there any water coming out of it?
Đáp. NO
Đáp. NO
Hỏi. Is there an odor coming out of it?
Đáp. NO
Đáp. NO
Hỏi. Is there loose asphalt around it or is it more like smooth dip?
Đáp. There is loose asphalt around it
Đáp. There is loose asphalt around it
Hỏi. How large is the hole?
Đáp. 6 feet
Đáp. 6 feet
Hỏi. Is the pothole located on a freeway on ramp or off ramp?
Đáp. NO
Đáp. NO
Hỏi. What were you doing when you encountered the pothole/depression?
Đáp. Biking
Đáp. Biking
Hỏi. If signage, a barricade, cone or other device covers the pothole whose name appears on it? (e.g., EBMUD)
Đáp. EBMUD
Đáp. EBMUD
2 Bình luậns
Được thừa nhận City of Oakland (Chính thức đã xác nhận)
At your convenience, please review the following information regarding the City of Oakland Street/Sidewalk Maintenance Program:
Facts About Oakland's Infrastructure - Streets & Sidewalks http://www2.oaklandnet.com/Government/o/PWA/s/SST/index.htm
5-Year Paving Plan http://www2.oaklandnet.com/Government/o/PWA/o/EC/s/STS/OAK030328 Please check back for status updates, or contact us directly at 510-615-5566.
Đã đóng City of Oakland (Chính thức đã xác nhận)