Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
The Town is working with Southern Connecticut Gas and its sub-contractors to replace all removed line striping as soon as possible. Thank you for reporting this site to the Town.
The stop lines have been temporarily painted at the intersection and will be permanently painted in the spring. Thank you for reporting this site to the Town.
7 Comments
Staff Engineer (Verified Official)
Acknowledged Staff Engineer (Verified Official)
Staff Engineer (Verified Official)
Engineering Inspector (Registered User)
Closed Engineering Inspector (Registered User)
Reopened M. Lockett (Registered User)
Closed Engineering Inspector (Registered User)