Sharraxaadda
Just repave 30th because if you drive down any other road you dont see the issues 30th ave N is still having on curb sides. However I don't appreciate getting splashed with water taking the trash out to curb. So please add additional asphalt ASAP. I will mark the road with an X if you need help seeing the standing water? Or look at my pic a day after a little rain. I waited to take pic so the engineers can not say from heavy rain cause you can see the road is dry. Dangerous for cyclists.
sidoo kale waydiiyey...
J. Any rain causes standing large pile of water
J. In front of 1108 address residence in bike lane on south side of 30th ave N
21 Faalladas
La qiray Council Aide District 3 (La Caddeeyey Rasmi ah)
CSR2 (La Caddeeyey Rasmi ah)
Customer Support (La Caddeeyey Rasmi ah)
La xidhay Engineering 0 (Isticmaale Diiwaangashan)
MK (Isticmaale Diiwaangashan)
Reopened MK (Isticmaale Diiwaangashan)
Denton Z (Isticmaale Diiwaangashan)
Yeah... I opened a ticket for this over a month ago and I was told it would be complete a week later. This project manager is terrible at his job if he thinks the water drains after a day. LOL
It hasn't rained since Wednesday morning and water hasn't moved (and this is just a recent example).
I'm so tired of trying to time my walks because people drive by and splash water.
Denton Z (Isticmaale Diiwaangashan)
La qiray Council Aide District 3 (La Caddeeyey Rasmi ah)
CoffeePot Cruiser (Isticmaale Diiwaangashan)
MK (Isticmaale Diiwaangashan)
Original picture taken 10/09/2018 & same PICTURE 10/12/2018 taken in evening last night 8pm. (Hmmm & they inspected? Such a lie). Nobody would complain if we didn't have a situation. At this point I have now proven to project manager on how long the water sits at these low asphalt areas. PLEASE FIX MINE ASAP.
letsworktogether (Isticmaale Diiwaangashan)
Keep this alive folks. The number and size of puddles of standing water on this road is not acceptable.
Engineering 0 (Isticmaale Diiwaangashan)
MK (Isticmaale Diiwaangashan)
La xidhay Engineering 0 (Isticmaale Diiwaangashan)
Reopened letsworktogether (Isticmaale Diiwaangashan)
This problem is very much unresolved. I drive 30th Avenue between 16th and 9th Street a few times everyday. I am also a cyclist. No matter what the contractor or someone sitting in a downtown office may tell the engineering department. The facts remain that we have a newly repaved road and ponding water is worse than it ever was before repaving. Now we have whiter bike lanes yet they are commonly blocked with standing water causing bicyclist to veer into the unsafe path of a moving vehicle or traffic.
Why is the city reluctant to have the contractor properly complete the work we taxpayers are paying for?
Customer Support (La Caddeeyey Rasmi ah)
Engineering 0 (Isticmaale Diiwaangashan)
La qiray Customer Support (La Caddeeyey Rasmi ah)
MK (Isticmaale Diiwaangashan)
La xidhay Engineering 0 (Isticmaale Diiwaangashan)