Description
Is this the final repair of a broken electrical line (with a plastic lunch bag and electrical tape) before the sidewalk concrete pour?
also asked...
Q. Address of Electric Issue?
A. No Answer Given
A. No Answer Given
Is this the final repair of a broken electrical line (with a plastic lunch bag and electrical tape) before the sidewalk concrete pour?
4 Comments
City of Alameda (Verified Official)
An anonymous SeeClickFix user (Registered User)
AMP - Operations (Verified Official)
Closed An anonymous SeeClickFix user (Registered User)