Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out
Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out