Description
Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out
Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out
4 Comments
Acknowledged DC 311 (Registered User)
Closed DC 311 (Registered User)
Reopened SCain (Registered User)
Acknowledged DC 311 (Registered User)