Description
Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out
Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out
4 Commentaires
Reconnu DC 311 (Utilisateur inscrit)
Clos DC 311 (Utilisateur inscrit)
Réouvert SCain (Utilisateur inscrit)
Reconnu DC 311 (Utilisateur inscrit)