Descrizione
Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out
Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out
4 Commentos
Riconosciuto DC 311 (Utente registrato)
Chiusa DC 311 (Utente registrato)
Reopened SCain (Utente registrato)
Riconosciuto DC 311 (Utente registrato)