Acknowledged by: City of Houston

City Engineer Признана

2890 Main Street Houston, TX 77002, United States of America Show on Map Hide Map
Move the marker to represent your issue's location. The address will not change.

Репортер

Issue ID:

5111521

Submitted To:

City of Houston

Category:

City Engineer

Viewed:

131 times

Neighborhood:

Midtown

Reported via:

mobile application

Reported:

on

Service Request ID:

318435

Description

sidewalks on both sides of Main are barricaded for construction. same is true on Mcgowen between main and travis, and the entire block around the new high-rise going up between Main and Fannin. conditions are unsafe for able-bodied and handicapped pedestrians: car and rail traffic in two directions. this location is in close proximity to the mcgowen light rail stop; Metro users are forced into the street and the rail right-of way - or forced to walk a full four blocks out of the way. at least one sidewalk on main must be re-opened to address this very dangerous situation.

also asked...
Q. What is your concern? Select one and describe details in Additional Description:
A. Sidewalk

Post a New Comment

5 Comments

  • Признана City of Houston 311 (Verified Official)

  • Sarah (Registered User)

  • Roger Neal (Registered User)

  • Andrew E Nelson (Registered User)

  • Andrew E Nelson (Registered User)

New Comment

Public status changes are not available for this issue.