Waxa qiray: City of Houston

City Engineer La qiray

2890 Main Street Houston, TX 77002, United States of America Ka Muuji Khariidadda Qari Khariidadda
Move the marker to represent your issue's location. The address will not change.

Bixi Aqoonsiga:

5111521

Submitted To:

City of Houston

Category:

City Engineer

Arkay:

130 jeer

Xaafadda:

Midtown

La sheegay iyadoo la adeegsanayo:

mobile application

La sheegay:

kusaabsan/saaran

Aqoonsiga Codsiga Adeegga:

318435

Sharraxaadda

sidewalks on both sides of Main are barricaded for construction. same is true on Mcgowen between main and travis, and the entire block around the new high-rise going up between Main and Fannin. conditions are unsafe for able-bodied and handicapped pedestrians: car and rail traffic in two directions. this location is in close proximity to the mcgowen light rail stop; Metro users are forced into the street and the rail right-of way - or forced to walk a full four blocks out of the way. at least one sidewalk on main must be re-opened to address this very dangerous situation.

sidoo kale waydiiyey...
S. What is your concern? Select one and describe details in Additional Description:
J. Sidewalk

Soo Dhig Faallo Cusub

5 Faalladas

  • La qiray City of Houston 311 (La Caddeeyey Rasmi ah)

  • Sarah (Isticmaale Diiwaangashan)

  • Roger Neal (Isticmaale Diiwaangashan)

  • Andrew E Nelson (Isticmaale Diiwaangashan)

  • Andrew E Nelson (Isticmaale Diiwaangashan)

Faallo Cusub

Public status changes are not available for this issue.