Deskripsyon
Paving work on Fairmount drive concluded in October. Metal "no parking/tow away" signs, orange cones, and stormwater drain screens etc are still on the street and need to be picked up. thank you.
Paving work on Fairmount drive concluded in October. Metal "no parking/tow away" signs, orange cones, and stormwater drain screens etc are still on the street and need to be picked up. thank you.
6 Komentos
Kinilala City of Ann Arbor (Beripikadong Opisiyal)
RMSOX (Rehistradong User)
Neighborhood Walker (Rehistradong User)
Neighborhood Walker (Rehistradong User)
City of Ann Arbor (Beripikadong Opisiyal)
Isinara City of Ann Arbor (Beripikadong Opisiyal)