The curbing along the Hanover Crossing Way on both sides of the street are badly crumbling, some parts are gone. The street has dips and cracking. The damages go up to Patuxent Quarter Road. Need have an inspection to be repaired.
还问了...
问 How many feet needs replaced
答 没有给出答案
答 没有给出答案
5 评论s
DPW HWYS Jim Barker (官方验证)
DPW HWYS Shelley F (官方验证)
DPW HWYS Shelley F (官方验证)
已确认 DPW HWYS M. Wolf (官方验证)
关闭 DPW HWYS M. Wolf (官方验证)