Descrição
Run-off control measures not in place or seriously inadequate. Muddy water running away from construction site in both directions but heaviest toward East Ponce and downhill on East Ponce to the west. Unfortunately I didn't have my phone with me, so no pic.
6 Comentários
Decatur Public Works - J Maximuk (Utilizador Registado)
David (Utilizador Registado)
David (Utilizador Registado)
Stan (Utilizador Registado)
Decatur Public Works - A Hedgebeth (Oficial Verificado)
Encerradas Decatur Public Works - A Hedgebeth (Oficial Verificado)
Thank you for your post. All erosion control measures were in placed before the demo of the residence started.
I contacted the contractor this morning, he will clean the street if needed and refresh the construction exit.
Thank you again for the post.