Deskripsyon
Run-off control measures not in place or seriously inadequate. Muddy water running away from construction site in both directions but heaviest toward East Ponce and downhill on East Ponce to the west. Unfortunately I didn't have my phone with me, so no pic.
6 Komentos
Decatur Public Works - J Maximuk (Rehistradong User)
David (Rehistradong User)
David (Rehistradong User)
Stan (Rehistradong User)
Decatur Public Works - A Hedgebeth (Beripikadong Opisiyal)
Isinara Decatur Public Works - A Hedgebeth (Beripikadong Opisiyal)
Thank you for your post. All erosion control measures were in placed before the demo of the residence started.
I contacted the contractor this morning, he will clean the street if needed and refresh the construction exit.
Thank you again for the post.