Description
Ground super soft and soggy at the edge of the road...a 100lb dig sinks a good 7-8" into the ground just walking and creek needs to be dredged next to bridge so there is room for excess water during rains/melts. Silt in creek has almost filled in to top of culvert, diverting water to sides of road and eroding roadbed
1 Comment
Closed Bryce (Registered User)