Description
Our driveways/sidewalks were dug up the first week of april. We still dont have access to our driveway - others were paved but ours was left, along with several sections of sidewalk. Its been almost six weeks. You also cut down the only tree on our street, a beautiful old tree that provided the only shade on the street
2 Comments
City of Malden (Verified Official)
Κλειστό Yem Lip (Director of Engineering) (Verified Official)