说明
Our driveways/sidewalks were dug up the first week of april. We still dont have access to our driveway - others were paved but ours was left, along with several sections of sidewalk. Its been almost six weeks. You also cut down the only tree on our street, a beautiful old tree that provided the only shade on the street
2 评论s
City of Malden (官方验证)
关闭 Yem Lip (Director of Engineering) (官方验证)