الوصف
Almost a year since I've complained by the lack of pedestrian right of way signs, I've almost been hit by oncoming cars coming from the Holland tunnel side. I was told a year ago when using this service that signs would go up as soon as in stock. This is a danger and this whole Blvd up to Hoboken needs traffic calming measures before something serious happens.
سئل أيضا...
Q. Please select the issue:
A. 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
A. 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
Q. Additional Information
A. لا جواب نظرا
A. لا جواب نظرا
9 تعليقs
RRC <small class="fwn">(تم التحقق رسميا)</small>
Oliver - Resident (مستخدم مسجل)
تم إقراره AndrewV (مستخدم مسجل)
Oliver - Resident (مستخدم مسجل)
Traffic – Jennifer C (تم التحقق رسميا)
Traffic – Jennifer C (تم التحقق رسميا)
Oliver - Resident (مستخدم مسجل)
Oliver - Resident (مستخدم مسجل)
Engineering - Althea (تم التحقق رسميا)