Description
Tufts Construction is replacing the water main on Poplar St. Residents were given a letter from the City Engineering Dept on July 19 stating the "during construction, trenches and other excavated areas will be backfilled and patched." This has not happened and has caused a severe dust problem in the neighborhood. The trenches have been backfilled but not patched.
We are not able to keep our windows open because of the dust from the construction.
7 Comments
City of Malden (Verified Official)
Robert P. Knox Jr. (Director of Public Works) (Verified Official)
Robert P. Knox Jr. (Director of Public Works) (Verified Official)
Closed Glen Calla (Engineering Department) (Registered User)
Thank you for your patience.
Dave (Registered User)
Reopened Dave (Registered User)
Yem Lip (Director of Engineering) (Verified Official)