Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to re-evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
The Engineering Department originally inspected the site on 8/18/2016 and re-inspected the site on 1/4/2017. We have determined that the sidewalk, and driveway apron do need to be repaired. The site has been added to our master list for repairs.
The Town currently repairs sidewalks based on the roads with the oldest complaints. Once we get to a street, we attempt to repair all sidewalk problems on the street. We are currently working on streets with complaints from 2007 and are about to begin 2008 streets. Based on current funding and given your street is a 2010 street, we anticipate it to take from 3 to 8 years to get to the street.
3 Commentaires
Staff Engineer (Membre officiel vérifié)
Reconnu Staff Engineer (Membre officiel vérifié)
Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to re-evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
The Engineering Department originally inspected the site on 8/18/2016 and re-inspected the site on 1/4/2017. We have determined that the sidewalk, and driveway apron do need to be repaired. The site has been added to our master list for repairs.
Clos Engineering Inspector (Utilisateur inscrit)