Description
The water line leak ( at the corner of Cambridge and Laurel) was repaired but required the concrete sidewalk to be damaged. The maintenance crew used asphalt to hopefully temporarily repair the sidewalk. I want to make sure that this is the case and that concrete will be used to finalize the repair.
6 Comments
Public Works - Jessica (Verified Official)
Acknowledged Town of Gilbert (Verified Official)
Public Works - Rafael (Registered User)
Town of Gilbert (Verified Official)
Jose Valdivia (Registered User)
Closed Town of Gilbert (Verified Official)