Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
This road is a 2008 street,
The Town currently repairs sidewalks based on the roads with the oldest complaints. Once we get to a street, we attempt to repair all sidewalk problems on the street. We are currently working on streets with complaints from 2008.
We are currently awaiting more funding to address the 2008 Streets.
The Town currently repairs sidewalks based on the roads with the oldest complaints. Once we get to a street, we attempt to repair all sidewalk problems on the street. We are currently working on streets with complaints from 2007 and are about to begin 2008 streets. Based on current funding and given your street is a 2008 street, we anticipate it to take from 0 to 3 years to get to the street.
3 Comments
Staff Engineer (Verified Official)
Acknowledged Staff Engineer (Verified Official)
Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
This road is a 2008 street,
The Town currently repairs sidewalks based on the roads with the oldest complaints. Once we get to a street, we attempt to repair all sidewalk problems on the street. We are currently working on streets with complaints from 2008.
We are currently awaiting more funding to address the 2008 Streets.
We will reevaluate the sidewalk.
Closed Engineering Inspector (Registered User)