说明
The sidewalk was destroyed and replaced with temporary gravel fill in June 2019. This street is a direct pedestrian connection to Brookrun Park. Strollers, wheelchairs and bikes can now not safely use the sidewalk in this section so they are continuously in the street.
3 评论s
已确认 Dunwoody Public Works (官方验证)
Dunwoody Public Works (官方验证)
关闭 Dunwoody Public Works (官方验证)