Description
This section of sidewalk was destroyed and replaced with temporary gravel fill in June 2019. This street is a direct pedestrian connection to Brookrun Park (see park in picture). Strollers, wheelchairs and bikes can not safely use the sidewalk in this section so they are forced to travel in the street, which in this case is a very busy road, Peeler. This gravel stretch is very uneven and unstable and therefore not traversed safely by walkers/runners as well.
3 Comments
Признана Dunwoody Public Works (Verified Official)
Dunwoody Public Works (Verified Official)
Закрыта Dunwoody Public Works (Verified Official)