Hi. Over 30 days with no response. The 50 feet of varying potholes have not been fixed by what was supposed to be a complete paving of concord. Is concord being paved? If not before winter someone needs to come over with a truck and roller to fix the mess. The noise pollution created is high and with all the speeding on Concord to avoid the stops is terrible. Please fix the block between Arden and Shoreham. Not a sloppy patch. Thank you.
Nothing. Are they getting paved? Please ask them to do a thorough job if its just an asphalt shovel deal. Their attempts previously have been lackluster. Thank you.
Concord Street was paved in 2015. Issue resolved. If you need to report another issue please submit to See Click Fix or call Department of Public Works at (203) 946 - 7700. Thanks.