Mô tả
This lot was clear cut, leveled out, retaining wall built on the west side, large limerocks on the south side, and limerock edging right up against the creek. A small building was built on the property. Never have we seen any construction permits posted. Not sure if this is a sediment problem but should there not be a buffer next to the creek?
cũng đã hỏi...
Hỏi. Are there erosion control Practices in place?
Đáp. Chưa có Câu trả lời nào
Đáp. Chưa có Câu trả lời nào
8 Bình luậns
ACC Admin (Người dùng đã đăng ký)
Concerned neighbor (Người dùng đã đăng ký)
Lucyspin (Người dùng đã đăng ký)
Nary (Người dùng đã đăng ký)
Alachua County Environmental Protection (Người dùng đã đăng ký)
Lucyspin (Người dùng đã đăng ký)
Được thừa nhận Alachua County Environmental Protection (Người dùng đã đăng ký)
Thank you for your concern on this issue. ACEPD staff are following up with the property owners to address erosion and sedimentation that occured following the storm on 2/6. Staff are working with the owners to stabilize the site and to prevent further erosion and sedimentation of the adjacent creek bed and stormwater systems. If you have any specific concerns or questions feel free to contact the Water Resources group at 352-264-6800.
The City of Gainesville is reviewing the permitting status of the work on the property. For more information on this status contact City of Gainesville Environmental Coordinator Liliana Kolluri at 352-393-8188.
Đã đóng Alachua County Environmental Protection (Người dùng đã đăng ký)