Deskripsyon
Need crosswalk painted across entrance and exit lanes of JC Medical Center and medical office building on Jersey Ave.
ay nagtanong din...
T. Please select the issue:
S. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
S. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
T. Additional Information
S. no pre existing crosswalk painting
S. no pre existing crosswalk painting
7 Komentos
RRC <small class="fwn">(Beripikadong Opisiyal)</small>
Traffic – Jennifer C (Beripikadong Opisiyal)
If you have any further questions, please call Resident Response Center at (201) 547-4900.
Kinilala Traffic – Jennifer C (Beripikadong Opisiyal)
If you have any further questions, please call Resident Response Center at (201) 547-4900.
Isinara Engineering - Althea (Beripikadong Opisiyal)
Al (Rehistradong User)
in what should have been a cross walk from the beginning there
Failure by med facility to care and the city is always 50 years late
Al (Rehistradong User)
Al (Rehistradong User)