The newly raised sidewalk (ADA ramp) will alleviate any ponding during a rain event, but the permanent repair needed to correct the standing water is the total resurfacing of the radius from Peeler Road (crown of the existing roadway will not allow for proper sheet-flow drainage). This matter will be further investigated by our Paving Manager to determine a proper repair considering Windwood Drive is not scheduled to get resurfaced within the next several years. Thank you for your continued patience and cooperation during this matter.
8 Comments
Acknowledged Dunwoody Public Works (Verified Official)
Dunwoody Public Works (Verified Official)
Closed Dunwoody Public Works (Verified Official)
Reopened Shea (Registered User)
Acknowledged Dunwoody Public Works (Verified Official)
Dunwoody Public Works (Verified Official)
Shea (Registered User)
Closed Dunwoody Public Works (Verified Official)